A downtime entry typed at the end of a shift is not a downtime that happened at the end of a shift. Keeping event time and ingestion time apart is the simplest fix for a whole class of misleading reports.
Most plant records carry a single timestamp. Very often it is the wrong one.
A line stops at 09:40. The operator is busy restarting it, so the stop is written on a clipboard and typed into a system at 13:55. A lab sample is drawn at 07:10 and the result is uploaded at 08:15. A technician’s handwritten note says “about half seven”. Each of these has two different times: when the event happened, and when the record reached a system. Stream-processing literature calls these event time and processing or ingestion time. The distinction matters just as much on a factory floor.
What goes wrong when the two are merged
If a system stores only the time a record was entered, then:
- Sequences invert. A maintenance intervention entered after a quality result appears to come after it, even when it happened before. Any analysis of “what preceded what” is now unreliable.
- Shift attribution shifts. Records entered at handover, or by the next shift, get counted against the wrong crew, line state or production order.
- Durations become fiction. A stop that lasted 20 minutes but was logged 4 hours later can be read as anything from 20 minutes to 4 hours, depending on how the report is built.
- Late data silently disappears. Daily reports that were already generated never include records that arrived afterwards, and nothing flags the omission.
None of these failures produce an error message. The charts look normal. They are just wrong.
Recording both, plus uncertainty
A sound record keeps at least:
| Field | Meaning | Example |
|---|---|---|
| Event time | When it happened in the plant | 09:40 |
| Event-time precision | How sure we are about that time | exact / ± 15 min / shift only |
| Recorded time | When it entered the system | 13:55 |
| Source | Who or what produced it | Operator terminal, lab file, scanned logbook page |
Precision deserves its own field. “About half seven” should not become 07:30:00.000. Rounding uncertainty away produces false precision, and that false precision later justifies conclusions it cannot support. If a question needs two-minute resolution and a record only has ± 15-minute precision, that record can provide context but cannot settle the question.
Practical rules
- Never overwrite event time with ingestion time, even when event time is missing. Store “unknown” and say so.
- Let people state event time at capture. Default it to “now”, but allow correction, and record that it was corrected.
- Flag late records. A large gap between event and recorded time is information. It might point to a workflow that does not fit the shift.
- Rebuild reports from event time. Reports regenerated after late data arrives should change, and the change should be visible.
- Check source clocks. Historians, PLCs, servers and phones drift. Measure the offsets during commissioning and record any corrections alongside the original timestamp.
How this shows up in OptiCore
OptiCore’s Capture pillar stores event time, its precision and recorded time as separate fields for every record, and its Evidence pillar uses time quality to decide whether a record can support a particular finding. You can see this in the homepage scenario: the paper maintenance note keeps its ± 15-minute uncertainty, and that uncertainty is one reason OptiCore declines to name a cause.